{"id":4763,"date":"2026-01-20T01:52:52","date_gmt":"2026-01-19T20:22:52","guid":{"rendered":"https:\/\/ceylondailynews.lk\/home\/?p=4763"},"modified":"2026-01-20T01:59:49","modified_gmt":"2026-01-19T20:29:49","slug":"colombos-new-flyover","status":"publish","type":"post","link":"https:\/\/ceylondailynews.lk\/home\/2026\/01\/20\/colombos-new-flyover\/","title":{"rendered":"Colombo&#8217;s New Flyover Finally Opens to Public: A Rs. 3.2 Billion Solution to Traffic Congestion"},"content":{"rendered":"<h2 style=\"text-align: center;\"><em><strong>Colombo&#8217;s Rs. 3.2 billion Baladaksha Mawatha Flyover finally opens after years of delays! Find out how this will cut your commute time and ease traffic chaos.<\/strong><\/em><\/h2>\n<hr \/>\n<h3 style=\"text-align: center;\"><em>After years of delays and cost overruns, the Baladaksha Mawatha Flyover officially opened on January 19, 2026, promising to ease traffic chaos in one of Colombo&#8217;s busiest commercial zones.<\/em><\/h3>\n<hr \/>\n<h2 class=\"text-text-100 mt-3 -mb-1 text-[1.125rem] font-bold\">What This Means for Colombo Commuters<\/h2>\n<p class=\"font-claude-response-body break-words whitespace-normal leading-[1.7]\">Colombo residents and daily commuters finally received some good news this week. The long-awaited Baladaksha Mawatha Flyover opened its lanes to the public on Sunday, January 19, 2026, marking a significant milestone in the city&#8217;s ongoing battle against traffic congestion. Transport, Highways and <a href=\"https:\/\/www.uda.gov.lk\/\" target=\"_blank\" rel=\"noopener\">Urban Development<\/a> Minister <a href=\"https:\/\/ceylondailynews.lk\/home\/?s=Bimal+Rathnayake\">Bimal Rathnayake<\/a> officially declared the flyover open, bringing relief to thousands who navigate the congested central Colombo area every day.<\/p>\n<p class=\"font-claude-response-body break-words whitespace-normal leading-[1.7]\">The new infrastructure connects Galle Face to Kompannavidiya via Chittampalam A. Gardiner Mawatha, creating a smoother one-way traffic flow above the previously congested ground-level roads. At approximately 340 meters long and 11 meters wide, this elevated roadway represents more than just concrete and steel. It symbolizes progress in addressing one of Sri Lanka&#8217;s capital city&#8217;s most persistent challenges.<\/p>\n<h2 class=\"text-text-100 mt-3 -mb-1 text-[1.125rem] font-bold\">Understanding the Scale of Colombo&#8217;s Traffic Problem<\/h2>\n<p class=\"font-claude-response-body break-words whitespace-normal leading-[1.7]\">Traffic congestion in Colombo has reached crisis levels in recent years. According to government surveys, approximately 1.9 million people and nearly 600,000 vehicles enter the city daily from various parts of the country. This massive influx creates bottlenecks at key junctions, increases air and noise pollution, and wastes countless hours of productive time.<\/p>\n<p class=\"font-claude-response-body break-words whitespace-normal leading-[1.7]\">The Baladaksha Mawatha area sits at the heart of this congestion crisis. The zone hosts major government offices, commercial buildings, luxury hotels, and serves as a critical connection point between different parts of the city. The combination of heavy commercial activity, government operations, and residential traffic creates a perfect storm of vehicular chaos during peak hours.<\/p>\n<p class=\"font-claude-response-body break-words whitespace-normal leading-[1.7]\">Before this flyover opened, vehicles had to navigate through crowded ground-level intersections, often spending 30 to 45 minutes covering distances that should take only five to ten minutes. The new elevated roadway bypasses these congestion points entirely, allowing traffic to flow continuously above the chaos below.<\/p>\n<h2 class=\"text-text-100 mt-3 -mb-1 text-[1.125rem] font-bold\">The Journey from Planning to Reality: A Story of Challenges<\/h2>\n<p class=\"font-claude-response-body break-words whitespace-normal leading-[1.7]\">The Baladaksha Mawatha Flyover represents the third structure in a comprehensive project designed to reduce traffic congestion in and around the Colombo city limits. While this achievement deserves celebration, the road to completion was far from smooth.<\/p>\n<h3 class=\"text-text-100 mt-2 -mb-1 text-base font-bold\">Original Plans and Early Optimism<\/h3>\n<p class=\"font-claude-response-body break-words whitespace-normal leading-[1.7]\">Several years ago, urban planners and government officials identified the need for three flyovers in the Kompannavidiya area. The first two were completed successfully, setting the stage for the final piece of the puzzle. The Baladaksha Mawatha Flyover was originally scheduled for completion in 2022, with an estimated budget of Rs. 2.7 billion.<\/p>\n<p class=\"font-claude-response-body break-words whitespace-normal leading-[1.7]\">Construction work officially began on June 21, 2021, with expectations high for a June 20, 2022 completion date. Engineers and workers mobilized quickly, and initial progress appeared promising. However, circumstances beyond anyone&#8217;s control would soon derail these carefully laid plans.<\/p>\n<h3 class=\"text-text-100 mt-2 -mb-1 text-base font-bold\">The Economic Crisis Hits<\/h3>\n<p class=\"font-claude-response-body break-words whitespace-normal leading-[1.7]\">Sri Lanka experienced a severe economic crisis in 2022, sending shockwaves through every sector of society. The construction industry felt the impact immediately. Foreign currency shortages made importing essential materials nearly impossible. Inflation skyrocketed, making everything from cement to steel dramatically more expensive. Many construction projects across the country ground to a halt.<\/p>\n<p class=\"font-claude-response-body break-words whitespace-normal leading-[1.7]\">The Baladaksha Mawatha Flyover was not immune to these challenges. Work slowed significantly, and in some periods, stopped entirely. The completion date was pushed back repeatedly, first to November 30, 2025, and then beyond.<\/p>\n<h3 class=\"text-text-100 mt-2 -mb-1 text-base font-bold\">The Police Housing Complication<\/h3>\n<p class=\"font-claude-response-body break-words whitespace-normal leading-[1.7]\">Adding to the economic challenges, the project faced a significant logistical obstacle. Six police residential quarters stood directly in the proposed construction path. These homes housed police officers and their families, making relocation a sensitive matter requiring careful coordination.<\/p>\n<p class=\"font-claude-response-body break-words whitespace-normal leading-[1.7]\">In April 2025, Minister Bimal Rathnayake personally visited the construction site to address the delays. During this inspection, which included Acting Inspector General of Police Priyantha Weerasuriya and other senior officials, the gravity of the situation became clear. The ministry revealed that approximately Rs. 400 million had already been paid to contractors as delay charges, with an additional daily loss of Rs. 500,000 accumulating as construction remained incomplete.<\/p>\n<p class=\"font-claude-response-body break-words whitespace-normal leading-[1.7]\">Following field inspections and intensive negotiations with senior police officials, solutions were finally found. The affected police families received alternative housing arrangements, allowing construction crews to accelerate their work. This breakthrough proved crucial in bringing the project to completion.<\/p>\n<h3 class=\"text-text-100 mt-2 -mb-1 text-base font-bold\">The Final Cost<\/h3>\n<p class=\"font-claude-response-body break-words whitespace-normal leading-[1.7]\">All these delays and complications came with a significant price tag. The project&#8217;s final cost reached Rs. 3.2 billion, approximately Rs. 1 billion more than the original Rs. 2.7 billion estimate. While this cost overrun is substantial, officials argue that the long-term benefits justify the additional expense.<\/p>\n<h2 class=\"text-text-100 mt-3 -mb-1 text-[1.125rem] font-bold\">How the New Flyover Works<\/h2>\n<p class=\"font-claude-response-body break-words whitespace-normal leading-[1.7]\">The Baladaksha Mawatha Flyover features a straightforward but effective design. The structure carries one-way traffic from the Galle Face area toward Kompannavidiya, passing over the railway tracks and Beira Lake while connecting with Chittampalam A. Gardiner Mawatha.<\/p>\n<p class=\"font-claude-response-body break-words whitespace-normal leading-[1.7]\">The flyover accommodates two traffic lanes, each designed to international safety standards. The 11-meter width provides adequate space for vehicles while maintaining buffer zones for safety. The elevated structure maintains minimum clearances of 6.5 meters over railway lines and 5.2 meters over roads, ensuring safe passage for all vehicles below.<\/p>\n<p class=\"font-claude-response-body break-words whitespace-normal leading-[1.7]\">Drivers approaching from Galle Face can now continue their journey without stopping at ground-level intersections. This continuous flow eliminates the stop-and-go traffic pattern that previously characterized the route, significantly reducing travel times during peak hours.<\/p>\n<h2 class=\"text-text-100 mt-3 -mb-1 text-[1.125rem] font-bold\">Expected Benefits for Commuters and Businesses<\/h2>\n<p class=\"font-claude-response-body break-words whitespace-normal leading-[1.7]\">The opening of this flyover brings multiple advantages to different groups of people who use this route regularly.<\/p>\n<h3 class=\"text-text-100 mt-2 -mb-1 text-base font-bold\">Time Savings<\/h3>\n<p class=\"font-claude-response-body break-words whitespace-normal leading-[1.7]\">For daily commuters, time is precious. Many Colombo workers spend two to three hours traveling each day, time that could be spent with family, pursuing education, or simply resting. The flyover is expected to cut travel times by 15 to 20 minutes for routes passing through this area, adding up to significant annual time savings.<\/p>\n<h3 class=\"text-text-100 mt-2 -mb-1 text-base font-bold\">Business Efficiency<\/h3>\n<p class=\"font-claude-response-body break-words whitespace-normal leading-[1.7]\">Businesses operating in the area will benefit from improved logistics. Delivery vehicles, service providers, and employees will all reach their destinations faster and more reliably. This increased efficiency translates directly into cost savings and improved customer service.<\/p>\n<h3 class=\"text-text-100 mt-2 -mb-1 text-base font-bold\">Reduced Fuel Consumption<\/h3>\n<p class=\"font-claude-response-body break-words whitespace-normal leading-[1.7]\">When vehicles sit in traffic jams, they burn fuel without making progress. The continuous flow enabled by the flyover means engines spend less time idling, reducing fuel consumption. With fuel prices always a concern for Sri Lankan families and businesses, this benefit provides real economic relief.<\/p>\n<h3 class=\"text-text-100 mt-2 -mb-1 text-base font-bold\">Environmental Impact<\/h3>\n<p class=\"font-claude-response-body break-words whitespace-normal leading-[1.7]\">Fewer vehicles idling in traffic means reduced carbon emissions and air pollution. The commercial zone around Baladaksha Mawatha has suffered from poor air quality due to constant traffic congestion. The improved traffic flow should lead to measurable improvements in air quality over time.<\/p>\n<h3 class=\"text-text-100 mt-2 -mb-1 text-base font-bold\">Safety Improvements<\/h3>\n<p class=\"font-claude-response-body break-words whitespace-normal leading-[1.7]\">Traffic congestion increases accident risks as frustrated drivers make risky maneuvers to escape jams. The organized, flowing traffic pattern on the flyover should reduce accident rates, making the commute safer for everyone.<\/p>\n<h2 class=\"text-text-100 mt-3 -mb-1 text-[1.125rem] font-bold\">Part of a Bigger Picture: Colombo&#8217;s Infrastructure Development<\/h2>\n<p class=\"font-claude-response-body break-words whitespace-normal leading-[1.7]\">The Baladaksha Mawatha Flyover represents one piece of a much larger infrastructure puzzle that Colombo must solve to remain competitive as a modern capital city.<\/p>\n<h3 class=\"text-text-100 mt-2 -mb-1 text-base font-bold\">The Sustainable Road Development Programme<\/h3>\n<p class=\"font-claude-response-body break-words whitespace-normal leading-[1.7]\">This flyover was constructed under the Sustainable Road Development Programme of the Ministry of Transport, Highways and Urban Development. The program takes a comprehensive approach to addressing urban traffic challenges, recognizing that isolated improvements provide limited benefits without coordinated planning.<\/p>\n<p class=\"font-claude-response-body break-words whitespace-normal leading-[1.7]\">Funding came from the Sri Lankan government, with implementation overseen by the Road Development Authority. This arrangement kept the project under local control while ensuring professional standards and accountability.<\/p>\n<h3 class=\"text-text-100 mt-2 -mb-1 text-base font-bold\">Other Ongoing Projects<\/h3>\n<p class=\"font-claude-response-body break-words whitespace-normal leading-[1.7]\">The government has approved feasibility studies for additional traffic management solutions around the Lotus Roundabout area, recognizing that more work remains. Officials expect traffic challenges to intensify with the completion of the Colombo Port City, the Port Access Road, and other major development projects currently underway.<\/p>\n<p class=\"font-claude-response-body break-words whitespace-normal leading-[1.7]\">Cabinet approval has been granted to select consultancy agencies to develop sustainable solutions for improving connectivity with major transport corridors throughout the city. These studies will inform future infrastructure investments, hopefully allowing lessons learned from the Baladaksha Mawatha project to prevent similar delays in upcoming work.<\/p>\n<h3 class=\"text-text-100 mt-2 -mb-1 text-base font-bold\">The Broader Vision<\/h3>\n<p class=\"font-claude-response-body break-words whitespace-normal leading-[1.7]\">Urban planners envision a Colombo where residents can move efficiently throughout the city using multiple transportation options. This vision includes not just flyovers and new roads, but also improved public transportation, dedicated bus lanes, pedestrian-friendly zones, and possibly even light rail systems in the future.<\/p>\n<p class=\"font-claude-response-body break-words whitespace-normal leading-[1.7]\">The government has also begun exploring multimodal transport centers where people can easily switch between different transportation methods. These centers would make public transportation more attractive, potentially reducing the number of private vehicles entering the city each day.<\/p>\n<h2 class=\"text-text-100 mt-3 -mb-1 text-[1.125rem] font-bold\">What Experts Say About Traffic Solutions<\/h2>\n<p class=\"font-claude-response-body break-words whitespace-normal leading-[1.7]\">Transportation experts emphasize that flyovers alone cannot solve Colombo&#8217;s traffic problems. While they provide immediate relief at specific congestion points, comprehensive solutions require multiple approaches working together.<\/p>\n<h3 class=\"text-text-100 mt-2 -mb-1 text-base font-bold\">Encouraging Public Transportation<\/h3>\n<p class=\"font-claude-response-body break-words whitespace-normal leading-[1.7]\">Many experts argue that improving public transportation should be the top priority. If buses, trains, and other public transport options were more comfortable, reliable, and convenient, many people would willingly leave their private vehicles at home. This shift could dramatically reduce the number of vehicles on the road.<\/p>\n<h3 class=\"text-text-100 mt-2 -mb-1 text-base font-bold\">Managing Demand<\/h3>\n<p class=\"font-claude-response-body break-words whitespace-normal leading-[1.7]\">Some transportation planners suggest that Colombo should consider demand management strategies. These might include congestion pricing (charging fees to drive in the busiest areas during peak hours), parking management, and incentives for carpooling or working from home on certain days.<\/p>\n<h3 class=\"text-text-100 mt-2 -mb-1 text-base font-bold\">Long-term Planning<\/h3>\n<p class=\"font-claude-response-body break-words whitespace-normal leading-[1.7]\">Experts stress the importance of integrated urban planning that considers transportation needs from the beginning. New developments should be designed to minimize traffic impact, with good connections to public transportation and provisions for pedestrians and cyclists.<\/p>\n<h2 class=\"text-text-100 mt-3 -mb-1 text-[1.125rem] font-bold\">Lessons Learned from the Delays<\/h2>\n<p class=\"font-claude-response-body break-words whitespace-normal leading-[1.7]\">The challenges encountered during the Baladaksha Mawatha Flyover construction provide valuable lessons for future infrastructure projects.<\/p>\n<h3 class=\"text-text-100 mt-2 -mb-1 text-base font-bold\">Plan for Economic Uncertainty<\/h3>\n<p class=\"font-claude-response-body break-words whitespace-normal leading-[1.7]\">Project planners should build more flexibility into budgets and timelines to account for economic shocks. While no one could have predicted the exact nature of Sri Lanka&#8217;s 2022 economic crisis, having contingency plans and emergency funding mechanisms might have reduced delays.<\/p>\n<h3 class=\"text-text-100 mt-2 -mb-1 text-base font-bold\">Address Relocations Early<\/h3>\n<p class=\"font-claude-response-body break-words whitespace-normal leading-[1.7]\">The two-year delay caused by police residential quarters highlights the importance of addressing relocation issues before construction begins. Future projects should identify and resolve such complications during the planning phase rather than discovering them mid-construction.<\/p>\n<h3 class=\"text-text-100 mt-2 -mb-1 text-base font-bold\">Improve Coordination<\/h3>\n<p class=\"font-claude-response-body break-words whitespace-normal leading-[1.7]\">Better coordination between different government departments could prevent conflicts and delays. Regular communication between the Transport Ministry, Police Department, and other agencies should be standard practice throughout project planning and execution.<\/p>\n<h3 class=\"text-text-100 mt-2 -mb-1 text-base font-bold\">Public Communication<\/h3>\n<p class=\"font-claude-response-body break-words whitespace-normal leading-[1.7]\">Keeping the public informed about project progress, challenges, and revised timelines builds trust and understanding. When people understand why delays occur, they are more likely to remain patient and supportive.<\/p>\n<h2 class=\"text-text-100 mt-3 -mb-1 text-[1.125rem] font-bold\">What Happens Next?<\/h2>\n<p class=\"font-claude-response-body break-words whitespace-normal leading-[1.7]\">The opening of the Baladaksha Mawatha Flyover marks a beginning rather than an ending. City officials and traffic management authorities will closely monitor the flyover&#8217;s impact on traffic patterns throughout the area.<\/p>\n<h3 class=\"text-text-100 mt-2 -mb-1 text-base font-bold\">Traffic Studies<\/h3>\n<p class=\"font-claude-response-body break-words whitespace-normal leading-[1.7]\">Engineers will conduct detailed studies to measure how effectively the flyover reduces congestion and travel times. This data will inform future infrastructure decisions and help justify the significant investment made in this project.<\/p>\n<h3 class=\"text-text-100 mt-2 -mb-1 text-base font-bold\">Maintenance Planning<\/h3>\n<p class=\"font-claude-response-body break-words whitespace-normal leading-[1.7]\">Like all infrastructure, the flyover will require regular maintenance to ensure safety and longevity. The Road Development Authority must develop comprehensive maintenance schedules and allocate appropriate funding for upkeep.<\/p>\n<h3 class=\"text-text-100 mt-2 -mb-1 text-base font-bold\">Adjusting Traffic Management<\/h3>\n<p class=\"font-claude-response-body break-words whitespace-normal leading-[1.7]\">Ground-level traffic patterns may need adjustment as drivers adapt to the new flyover. Traffic police and road authorities will monitor these changes and make necessary modifications to signal timings, lane markings, and other traffic management elements.<\/p>\n<h3 class=\"text-text-100 mt-2 -mb-1 text-base font-bold\">Planning Future Projects<\/h3>\n<p class=\"font-claude-response-body break-words whitespace-normal leading-[1.7]\">The government has already identified other congestion points requiring similar solutions. Learning from both the successes and challenges of the Baladaksha Mawatha project will help make future projects more efficient and cost-effective.<\/p>\n<h2 class=\"text-text-100 mt-3 -mb-1 text-[1.125rem] font-bold\">Public Reaction and Expectations<\/h2>\n<p class=\"font-claude-response-body break-words whitespace-normal leading-[1.7]\">Initial public reaction to the flyover opening has been largely positive, though tempered by frustration over the lengthy delays and cost increases.<\/p>\n<p class=\"font-claude-response-body break-words whitespace-normal leading-[1.7]\">Many commuters expressed relief that the project finally reached completion. Social media conversations showed people planning to test the new route during their Monday morning commute, eager to experience the promised time savings firsthand.<\/p>\n<p class=\"font-claude-response-body break-words whitespace-normal leading-[1.7]\">However, some citizens questioned whether the Rs. 1 billion cost overrun could have been avoided with better planning. These concerns reflect broader public frustration with government project management and the economic challenges Sri Lanka has faced in recent years.<\/p>\n<p class=\"font-claude-response-body break-words whitespace-normal leading-[1.7]\">Business owners in the area welcomed the development, anticipating improved accessibility for customers and suppliers. Several hotel managers mentioned that the flyover should make it easier for guests to reach their properties, particularly those arriving from the airport or other parts of the city.<\/p>\n<h2 class=\"text-text-100 mt-3 -mb-1 text-[1.125rem] font-bold\">Conclusion: A Step Forward for Colombo<\/h2>\n<p class=\"font-claude-response-body break-words whitespace-normal leading-[1.7]\">The Baladaksha Mawatha Flyover represents a significant investment in Colombo&#8217;s future. Despite the delays and cost overruns, the completed structure now serves as a testament to perseverance through difficult circumstances.<\/p>\n<p class=\"font-claude-response-body break-words whitespace-normal leading-[1.7]\">For the thousands of people who drive through this area each day, the flyover offers tangible relief from traffic congestion. The time saved, fuel conserved, and frustration reduced represent real improvements in daily life.<\/p>\n<p class=\"font-claude-response-body break-words whitespace-normal leading-[1.7]\">However, city officials and citizens alike recognize that much work remains. Colombo continues to grow, with more people and vehicles entering the city each year. The flyover provides breathing room, but comprehensive solutions to urban transportation challenges require sustained commitment to infrastructure development, public transportation improvement, and innovative traffic management.<\/p>\n<p class=\"font-claude-response-body break-words whitespace-normal leading-[1.7]\">As Minister Bimal Rathnayake thanked the Police Department and Road Development Authority for their cooperation in completing this project, he also acknowledged the road ahead. Future infrastructure projects must learn from this experience, avoiding unnecessary delays while delivering the solutions Colombo desperately needs.<\/p>\n<p class=\"font-claude-response-body break-words whitespace-normal leading-[1.7]\">The Baladaksha Mawatha Flyover now stands as both an achievement and a challenge \u2013 a successful completion that reminds everyone of the importance of better planning, coordination, and execution in future projects. For now, though, commuters can simply enjoy the smoother ride this elevated roadway provides as they navigate one of Colombo&#8217;s busiest areas.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-4766\" src=\"https:\/\/ceylondailynews.lk\/wp-content\/uploads\/2026\/01\/Colombos-New-Flyover-Finally-Opens-to-Public-A-Rs.-3.2-Billion-Solution-to-Traffic-Congestion3.jpg\" alt=\"\" width=\"2048\" height=\"1365\" srcset=\"https:\/\/ceylondailynews.lk\/wp-content\/uploads\/2026\/01\/Colombos-New-Flyover-Finally-Opens-to-Public-A-Rs.-3.2-Billion-Solution-to-Traffic-Congestion3.jpg 2048w, https:\/\/ceylondailynews.lk\/wp-content\/uploads\/2026\/01\/Colombos-New-Flyover-Finally-Opens-to-Public-A-Rs.-3.2-Billion-Solution-to-Traffic-Congestion3-300x200.jpg 300w, https:\/\/ceylondailynews.lk\/wp-content\/uploads\/2026\/01\/Colombos-New-Flyover-Finally-Opens-to-Public-A-Rs.-3.2-Billion-Solution-to-Traffic-Congestion3-1024x683.jpg 1024w, https:\/\/ceylondailynews.lk\/wp-content\/uploads\/2026\/01\/Colombos-New-Flyover-Finally-Opens-to-Public-A-Rs.-3.2-Billion-Solution-to-Traffic-Congestion3-768x512.jpg 768w, https:\/\/ceylondailynews.lk\/wp-content\/uploads\/2026\/01\/Colombos-New-Flyover-Finally-Opens-to-Public-A-Rs.-3.2-Billion-Solution-to-Traffic-Congestion3-1536x1024.jpg 1536w\" sizes=\"auto, (max-width: 2048px) 100vw, 2048px\" \/> <img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-4767\" src=\"https:\/\/ceylondailynews.lk\/wp-content\/uploads\/2026\/01\/Colombos-New-Flyover-Finally-Opens-to-Public-A-Rs.-3.2-Billion-Solution-to-Traffic-Congestion2.jpg\" alt=\"\" width=\"2048\" height=\"1365\" srcset=\"https:\/\/ceylondailynews.lk\/wp-content\/uploads\/2026\/01\/Colombos-New-Flyover-Finally-Opens-to-Public-A-Rs.-3.2-Billion-Solution-to-Traffic-Congestion2.jpg 2048w, https:\/\/ceylondailynews.lk\/wp-content\/uploads\/2026\/01\/Colombos-New-Flyover-Finally-Opens-to-Public-A-Rs.-3.2-Billion-Solution-to-Traffic-Congestion2-300x200.jpg 300w, https:\/\/ceylondailynews.lk\/wp-content\/uploads\/2026\/01\/Colombos-New-Flyover-Finally-Opens-to-Public-A-Rs.-3.2-Billion-Solution-to-Traffic-Congestion2-1024x683.jpg 1024w, https:\/\/ceylondailynews.lk\/wp-content\/uploads\/2026\/01\/Colombos-New-Flyover-Finally-Opens-to-Public-A-Rs.-3.2-Billion-Solution-to-Traffic-Congestion2-768x512.jpg 768w, https:\/\/ceylondailynews.lk\/wp-content\/uploads\/2026\/01\/Colombos-New-Flyover-Finally-Opens-to-Public-A-Rs.-3.2-Billion-Solution-to-Traffic-Congestion2-1536x1024.jpg 1536w\" sizes=\"auto, (max-width: 2048px) 100vw, 2048px\" \/> <img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-4769\" src=\"https:\/\/ceylondailynews.lk\/wp-content\/uploads\/2026\/01\/Colombos-New-Flyover-Finally-Opens-to-Public-A-Rs.-3.2-Billion-Solution-to-Traffic-Congestion1.jpg\" alt=\"\" width=\"2048\" height=\"1842\" srcset=\"https:\/\/ceylondailynews.lk\/wp-content\/uploads\/2026\/01\/Colombos-New-Flyover-Finally-Opens-to-Public-A-Rs.-3.2-Billion-Solution-to-Traffic-Congestion1.jpg 2048w, https:\/\/ceylondailynews.lk\/wp-content\/uploads\/2026\/01\/Colombos-New-Flyover-Finally-Opens-to-Public-A-Rs.-3.2-Billion-Solution-to-Traffic-Congestion1-300x270.jpg 300w, https:\/\/ceylondailynews.lk\/wp-content\/uploads\/2026\/01\/Colombos-New-Flyover-Finally-Opens-to-Public-A-Rs.-3.2-Billion-Solution-to-Traffic-Congestion1-1024x921.jpg 1024w, https:\/\/ceylondailynews.lk\/wp-content\/uploads\/2026\/01\/Colombos-New-Flyover-Finally-Opens-to-Public-A-Rs.-3.2-Billion-Solution-to-Traffic-Congestion1-768x691.jpg 768w, https:\/\/ceylondailynews.lk\/wp-content\/uploads\/2026\/01\/Colombos-New-Flyover-Finally-Opens-to-Public-A-Rs.-3.2-Billion-Solution-to-Traffic-Congestion1-1536x1382.jpg 1536w\" sizes=\"auto, (max-width: 2048px) 100vw, 2048px\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Colombo&#8217;s Rs. 3.2 billion Baladaksha Mawatha Flyover finally opens after years of delays! Find out how this will cut your commute time and ease traffic chaos. After years of delays&hellip; <\/p>\n","protected":false},"author":1,"featured_media":4764,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"rop_custom_images_group":[],"rop_custom_messages_group":[],"rop_publish_now":"no","rop_publish_now_accounts":{"twitter_205606689_205606689":""},"rop_publish_now_history":[{"account":"twitter_205606689_205606689","service":"twitter","timestamp":1768854231,"status":"error"}],"rop_publish_now_status":"done","_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[3,16,13],"tags":[4835,4841,4842,4834,4838,4837,4840,4843,4836,4839],"class_list":["post-4763","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-local","category-local-home","category-main-story","tag-baladaksha-mawatha","tag-bimal-rathnayake","tag-colombo-commute-time","tag-colombo-flyover","tag-colombo-infrastructure-2026","tag-kompannavidiya-flyover","tag-slave-island-flyover","tag-sri-lanka-traffic-solution","tag-traffic-congestion-colombo","tag-traffic-relief-colombo"],"_links":{"self":[{"href":"https:\/\/ceylondailynews.lk\/home\/wp-json\/wp\/v2\/posts\/4763","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ceylondailynews.lk\/home\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ceylondailynews.lk\/home\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ceylondailynews.lk\/home\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/ceylondailynews.lk\/home\/wp-json\/wp\/v2\/comments?post=4763"}],"version-history":[{"count":3,"href":"https:\/\/ceylondailynews.lk\/home\/wp-json\/wp\/v2\/posts\/4763\/revisions"}],"predecessor-version":[{"id":4770,"href":"https:\/\/ceylondailynews.lk\/home\/wp-json\/wp\/v2\/posts\/4763\/revisions\/4770"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ceylondailynews.lk\/home\/wp-json\/wp\/v2\/media\/4764"}],"wp:attachment":[{"href":"https:\/\/ceylondailynews.lk\/home\/wp-json\/wp\/v2\/media?parent=4763"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ceylondailynews.lk\/home\/wp-json\/wp\/v2\/categories?post=4763"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ceylondailynews.lk\/home\/wp-json\/wp\/v2\/tags?post=4763"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}